Upton Update

DSCF0545

On monday we built the porch roofs for 1900 Lincoln and gave the yard a good clean up.

DSCF0551DSCF0549

On Tuesday we were back at Upton to get the main floor exterior walls built and stood.

DSCF0553

We wanted to keep the power line hooked up (so we didn’t have to run the noisy generator all day everyday) so we strapped the existing power line to the new wall.

DSCF0552

Today we set the floor trusses and put the 2×4 ribbon on. After lunch we got called off of Upton to build temp stairs for the decks at 1319 Eleanor.

Leave a Reply

Your email address will not be published. Required fields are marked *